Planning Applications



Application Details

S/3102/15/FL

17-Dec-2015

26-Sep-2016

Full Planning

30-Sep-2016

Milton CP (DET)

Land at Chesterton Sidings, Cowley Road, Land at Chesterton Sidings, Cowley Road, Cambridge, CB2 9LD

A new 450 sq m station building and associated infrastructure, including 450 space rail station car park, 1000 cycle park, main vehicular access road to the station and creation of access route to the Guided Busway, pedestrian and cycle links to surrounding areas and extension to the Cambridge Guided Busway into the site along the alignment of the former St Ives Branch Line. Please note that parts of the application above are located within the boundary of Cambridge City Council and are being applied for under 15/2317/FUL

Decision Issued

This application has already been decided. You cannot comment on it

Associated Media

Plans, drawings and other material submitted to the local authority are protected by the Copyright, Designs and Patents Act 1988 (section 47). You may only use material which is downloaded and/or printed for consultation purposes, to compare current applications with previous schemes and to check whether developments have been completed in accordance with approved plans. Further copies must not be made without the prior permission of the copyright owner.

Description Filename
Design & Access Statement Part 1 151211_Mirror_Application_Design_and_Access_Statement_rev01_Part1.pdf
Design & Access Statement Part 2 151211_Mirror_Application_Design_and_Access_Statement_rev01_Part2.pdf
Design & Access Statement Part 3 151211_Mirror_Application_Design_and_Access_Statement_rev01_Part3.pdf
Design & Access Statement Part 4 151211_Mirror_Application_Design_and_Access_Statement_rev01_Part4.pdf
Access from Industrial Estate to Busway Plan 1135014-538919._Nuffieldclose-001RevA.pdf
Access at Nuffield Road allotment Plan 1135014-538920.CSPSIAW_ATK-HGN-00-DR-D-0006_Rev_P03_.pdf
Moss Bank Foot-Cycleway Access Plan 1135014-538921._CSI-MossBank-001RevB.pdf
Landscape Ecological Mitigation Plan 1 5134906_001_Landscape_Ecological_Mitigation_Plan_1_of_2_(rs).pdf
Landscape Ecological Mitigation Plan 2 5134906_002_-_Landscape_Ecological_Mitigation_Plan_2_of_2_(rs).pdf
Landscape Ecological Mitigation Station Square 5134906_003_Landscape_Ecological_Mitigation_-_Station_Square_(rs).pdf
Landscape Sections 1 of 2 5134906_004_-_Landscape_Sections_1_of_2.pdf
Landscape Sections 2 of 2 5134906_005_-_Landscape_Sections_2_of_2.pdf
Attachment Summary AttachmentSummary.pdf
Maintenance Depot Access Road GA 5134906-RLS-CIS-HWY-1001_-_Maintenance_Depot_Access_Road_GA.pdf
Maintenance Depot Access Road 5134906-RLS-CIS-HWY-1002_-_Maintenance_Depot_Access_Road_Access.pdf
Maintenance Depot Access Road Egress 5134906-RLS-CIS-HWY-1003_-_Maintenance_Depot_Access_Road_Egress.pdf
Decommissioning Management Plan Document 20151209-Decommissioning_Management_Plan_-_Full.pdf
Proposed Elevations South West & North A_E_00_P02revB_Proposed_Elevations_South_West_and_North.pdf
Proposed Elevations East A_E_00_P03revB_Proposed_Elevations_East.pdf
Proposed Visualisations Sheet 1 A_E_00_P04revB_Proposed_Visualisations_Sheet_1.pdf
Proposed Visualisations Sheet 2 A_E_00_P05revB_Proposed_Visualisations_Sheet_2.pdf
Location Plan A_L_00_P01revC_Location_Plan.pdf
Existing Site Plan A_L_00_P02revC_Existing_Site_Plan.pdf
Proposed Location Plan A_L_00_P03revD_Proposed_Location_Plan.pdf
Proposed Site Plan A_L_00_P04revD_Proposed_Site_Plan.pdf
Proposed Location Plan Land under CCC Jurisdiction A_L_00_P05revC_Proposed_Location_Plan_Land_under_CCC_Jurisdiction.pdf
Proposed Location Plan Land under SCDC Jurisdiction A_L_00_P06revC_Proposed_Location_Plan_Land_under_SCDC_Jurisdiction.pdf
Construction Site Access and Potential Contractors Compound A_L_00_P07revB_Construction_Site_Access_and_Potential_Contractors_Compound.pdf
Proposed Concourse Level Plan A_L_00_P10revB_Proposed_Concourse_Level_Plan.pdf
Proposed Mezzanine Level Plan A_L_00_P11revB_Proposed_Mezzanine_Level_Plan.pdf
Proposed Bridge Level Plan A_L_00_P12revB_Proposed_Bridge_Level_Plan.pdf
Proposed Roof Level Plan A_L_00_P13revB_Proposed_Roof_Plan.pdf
Proposed Cycle Parking Roof Plan and Elevations A_L_00_P14revB_Proposed_Cycle_Parking_Roof_Plan_and_Elevations.pdf
Transport Mode Overlay A_L_00_P15revB_Transport_Mode_Overlay.pdf
Existing Site Plan A_L_00_P16revA_Existing_Site_Plan_Cleared_Vegetation.pdf
Proposed Sections Sheet 1 A_S_00_P10revB_Proposed_Sections_Sheet_1.pdf
Proposed Sections Sheet 2 A_S_00_P11revB_Proposed_Sections_Sheet_2.pdf
Socio-Economic Statement Cambridge_North_Station_Socio-EconomicStatement_FINALNov15.pdf
Fee Calculation FeeCalculation.pdf
Cycleway Access 1 HGN_00_DR_D_0001_revP06_Cowley_Road_Pedestrian_Cycleway_Access_1.pdf
Cycleway Access 2 HGN_00_DR_D_0002_RevP05_Cowley_Road_Pedestrian_Cycleway_Access_2.pdf
HIA - Final HIA_-_Final.pdf
Utilities Assessment Utilities_Assessment_Full.pdf
Planning Statement Planning_Statement.pdf
Covering Letter 20151211-Ltr-Covering_Letter_to_SCDC_Redacted.pdf
Application Form with No Personal Data ApplicationFormNoPersonalData.pdf
North_Station_Amendment_-_NTS_151211_FINAL_Part4.pdf
North_Station_Amendment_-_NTS_151211_FINAL_Part3.pdf
Covering Letter 20151211-Ltr-Covering_Letter_to_SCDC_Redacted.pdf
Environmental_Statement_-_Intro_and_Chapter_1.pdf
Environmental_Statement_-_Chapter_2.pdf
Environmental_Statement_-_Chapter_3.pdf
Environmental_Statement_-_Chapter_4.pdf
Environmental_Statement_-_Chapter_5.pdf
Environmental_Statement_-_Chapter_6.pdf
Environmental_Statement_-_Chapter_7.pdf
Environmental_Statement_-_Chapter_8.pdf
Environmental_Statement_-_Chapter_9.pdf
Environmental_Statement_-_Chapter_10.pdf
Environmental_Statement_-_Chapter_11.pdf
Environmental_Statement_-_Chapter_12.pdf
Environmental_Statement_-_Chapter_13.pdf
Environmental_Statement_-_Chapter_14.pdf
Environmental_Statement_-_Chapter_15.pdf
Environmental_Statement_-Chapter_16.pdf
ES_Appendix_1.1_-_Red_Line_Boundary_Aerial.pdf
ES_Appendix_1.2_-_Cover_Page.pdf
ES_Appendix_1.2_-_Mirror_Application_Layout_Plan.pdf
ES_Appendix_1.3_-_Plan_of_Rail_Works_-_Custom.pdf
ES_Appendix_1.3_-Schedule_of_Works.pdf
ES_Appendix_2.1_-Screening_Request.pdf
ES_Appendix_2.3_-_Scoping_Request.pdf
ES_Appendix_2.5_-_Add_Scoping.pdf
ES_Appendix_3.1_-_Front_Cover.pdf
ES_Appendix_3.1_-_Red_Line_Boundary_Plan.pdf
ES_Appendix_3.2_-_Front_Cover.pdf
ES_Appendix_3.2_-_Proposed_Site_Layout.pdf
ES_Appendix_3.3_-_Comparison_Plan.pdf
ES_Appendix_-_4.1_-_Option_Studies_Binder.pdf
ES_Appendix_6.5_-_Bramblefields_MP.pdf
ES_Appendix_6.6_-_Ecological_Mitigation_Plans_(rs).pdf
ES_Appendix_6.6_-_Front_Cover.pdf
ES_Appendix_6.7_-_Open_Mosaic_Habitat_Plans.pdf
ES_Appendix_6.7_-_Open_Mosaic_Habitat.pdf
ES_Appendix_7.2_-_Definitions.pdf
ES_Appendix_7.3_-_Tables_7.4_and_7.5.pdf
ES_Appendix_7.4_-_Tables_7.6_and_7.7.pdf
ES_Appendix_9.1_-_Beds_and_Cambs.pdf
ES_Appendix_9.2_-_Western_Claylands.pdf
ES_Appendix_9.3_-_Landscape_SPD.pdf
ES_Appendix_9.5_-_Fen_Landscape.pdf
ES_Appendix_9.6_-_East_Anglian_Chalk.pdf
ES_Appendix_9.7_-__Front_Cover.pdf
ES_Appendix_9.7_-_Fig9.4_to_9.15__Viewpoint_Photographs.pdf
ES_Appendix_10.1_-_Baseline_Lighting_Assessment.pdf
ES_Appendix_10.2_-_Front_Cover.pdf
ES_Appendix_10.2_-_Proposed_Lighting.pdf
ES_Appendix_10.3_-_Dialux_(rs).pdf
ES_Appendix_10.4_-_Selux_Report.pdf
ES_Appendix_10.5_-_Front_Cover.pdf
ES_Appendix_10.5_-_Illumination_Plots.pdf
ES_Appendix_12.1_-_Cover.pdf
ES_Appendix_12.1_-_Transport_Technical_Note.pdf
ES_Appendix_12.2_-_Cover.pdf
ES_Appendix_12.2_-_Transport_Assessment_(rs)_Part1.pdf
ES_Appendix_12.2_-_Transport_Assessment_(rs)_Part2.pdf
ES_Appendix_12.2_-_Transport_Assessment_(rs)_Part3.pdf
ES_Appendix_12.2_-_Transport_Assessment_(rs)_Part4.pdf
ES_Appendix_12.3_-_Car_and_Cycle_Park_Management_Plan.pdf
ES_Appendix_14.1_-_Drainage_design_report.pdf
ES_Appendix_14.1_-_Pages_15_&_16_-_A3_Drawings.pdf
Environmental_Statement__Appendix_14.2_-_Revised_Drainage_Concept_Design.pdf
ES_Appendix_2.2_-_Screening_Opinion_Redacted.pdf
ES_Appendix_2.4_-_Scoping_Response_Redacted.pdf
ES_Appendix_3.4_-_CEMP_Redacted.pdf
ES_Appendix_5.1_-_Email_Binder_Redacted.pdf
ES_Appendix_6.1_-_Ecological_Phase_1_Habitat_Survey_Redacted.pdf
ES_Appendix_6.2_-_Ecological_Species_Specific_Surveys_Redacted.pdf
ES_Appendix_6.3_-_2015_Scoping_Survey_(rs)_Redacted.pdf
ES_Appendix_6.4_-_2015_Species_Survey_(rs)_Redacted.pdf
ES_Appendix_7.1_-_Ground_Investigation_Report_(rs)_Part1_Redacted.pdf
ES_Appendix_7.1_-_Ground_Investigation_Report_(rs)_Part4_Redacted.pdf
Appendix_7.5_-_Ground_Investigation_Report_Addendum_Redacted.pdf
ES_Appendix_8.1_-_Correspondence_Redacted.pdf
ES_Appendix_8.2_-_Archaeological_Desk_Based_Assessment_Redacted.pdf
ES_Appendix_8.3_-_WSI_&_TPE_Report_Redacted.pdf
ES_Appendix_9.4_-_Proposed_Viewpoints_Redacted.pdf
ES_Appendix_13.1_-_SWMP_Redacted.pdf
North_Station_Amendment_-_NTS_151211_FINAL_Part1.pdf
North_Station_Amendment_-_NTS_151211_FINAL_Part2.pdf
North_Station_Amendment_-_NTS_151211_FINAL_Part3.pdf
North_Station_Amendment_-_NTS_151211_FINAL_Part4.pdf
Application Form (Updated)_Application_Form_CCiC_Redacted.pdf
Applicaiton Form (Updated)_Application_Form_SCDC_Redacted.pdf
Ownership_Schedule.pdf
Decision Notice Decision_Notice.pdf
Planning Obligation under s106 dated 9 September 2016 s106_-_railway_station_-_9.9.16_-_redacted.pdf
HTS Name: wphappdetail03-default.hts
Logical ID: WPHAPPDETAIL
Stonewall, Gay and Lesbian Charity - opens in a new windowBeacon Authority logoInvestor in People logo