Planning Applications



Application Details

S/2903/14/OL

22-Dec-2014

Outline Planning (Large Major)

31-Aug-2017

Elsworth CP Cambourne CP Caxton CP

Land to the West of Cambourne (Excluding Swansley Wood Farm)

Development of up to 2,350 residential units including affordable housing; retail, use classes A1-A5 (up to 1.04 ha); offices/light industry, use class B1 (up to 5.66ha); community and leisure facilities, use class D1 and D2 (up to 0.92 ha); Two primary schools and one secondary school (up to 11.28 ha), use class D1; three vehicular access points including the extension and modification of Sheepfold Lane, a four arm roundabout provided on A1198/Caxton Bypass and an access point off the A1198, south of the Caxton Gibbet to serve the proposed employment uses; a network of segregated pedestrian and cycle routes; sustainable drainage system and other infrastructure; together with associated earth works, parking, open space, including equipped play, playing fields and landscaping.

Officer Drafting Recommendation

Associated Media

Plans, drawings and other material submitted to the local authority are protected by the Copyright, Designs and Patents Act 1988 (section 47). You may only use material which is downloaded and/or printed for consultation purposes, to compare current applications with previous schemes and to check whether developments have been completed in accordance with approved plans. Further copies must not be made without the prior permission of the copyright owner.

Description Filename
Site Notice 2903-14_Site_Notice.pdf
Application Boundary Plan Drg.no.85 S. 041.pdf
Plan 9Y1873-AA-01 9Y1873-AA-01A1.pdf
Plan 9Y1873-AA-02 9Y1873-AA-02A1.pdf
Plan 9Y1837-AA-03 9Y1873-AA-03A1.pdf
Application Boundary Layout 85_S-04I_Application_boundary_Layout1-A1_L_(1).pdf
Site Boundary 85S04I_Site_Boundary_A3_L_(1).pdf
Site Boundary 85S-04J_Site_Boundary.pdf
Parameters Plan 085S-60P_Parameters_Plan.pdf
Phasing Plan 85S-71J_Phasing_Plan.pdf
To view all the original application documents for land to the west of Cambourne please use the link in this document which will ta To_view_all_the_original_application_documents_for_land_to_the_west_of_Cambourne_please_use_the_link_in_this_document_which_will_ta.doc
To view the November 2015 amendments and additional information please use the link in this document which will take you to httpwww To_view_the_November_2015_amendments_and_additional_information_please_use_the_link_in_this_document_which_will_take_you_to_httpwww.doc
Agents letter 298197_AMENDED_17-06-16_-_Let003.14.06.2016.pdf
Surface water calculations methodology 298199_AMENDED_17-06-16_-_Surface_water_calcs_methodology_160414.pdf
Transport Technical note 298200_AMENDED_17-06-16_-_Transport_Technical_Note.pdf
Proposed A428 Southern Roundabout & Sheepfold Land Access modifications 298201_AMENDED_17-06-16_-_1501-23_PL01_Rev_B_-__Prop._A428_South_Rdbt__Sheepfold_Lane_Mods.pdf
Proposed Sheepfold Lane Modifications option 2 298202_AMENDED_17-06-16_-_1501-23_PL02_Rev_B_-_Sheepfold_Lane_Mods_Option_2.pdf
Landscape and ecology plan 298203_AMENDED_17-06-16_-_Landscape_and_ecology.pdf
Parameters plan 298204_AMENDED_17-06-16_-_Parameters_plan.pdf
Suggested route improvement 298205_AMENDED_17-06-16_-_Suggested_route_improvements_Rev_A.pdf
Appendix 12 Flood Risk Assessment 298206_AMENDED_17-06-16_-_Appendix_12.1b_FRA.pdf
Appendix A 298207_AMENDED_17-06-16_-_Appendix_A.pdf
Appendix B 298208_AMENDED_17-06-16_-_Appendix_B.pdf
Appendix C 298209_AMENDED_17-06-16_-_Appendix_C_LRes.pdf
Appendix D 298210_AMENDED_17-06-16_-_Appendix_D.pdf
Appendix E 298211_AMENDED_17-06-16_-_Appendix_E.pdf
Appendix F 298212_AMENDED_17-06-16_-_Appendix_F.pdf
Appendix G 298213_AMENDED_17-06-16_-_Appendix_G_LRes.pdf
Pedestrian cycle route assessment 1501-23_TN06_-_pedestrian_and_cyclist_audit_27.05.16.pdf
Transport addendum Appendix I 1501-23_TA_Addendum_(Appendix_I)_-_Part_2_of_10.pdf
Transport addendum Appendix J 1501-23_TA_Addendum_(Appendix_J)_-_Part_3_of_10.pdf
Transport addendum Appendix K 1501-23_TA_Addendum_(Appendix_K)_-_Part_4_of_10.pdf
Transport addendum Appendix L 1501-23_TA_Addendum_(Appendix_L_Cont.)_-_Part_6_of_10.pdf
Transport addendum Appendix L 1501-23_TA_Addendum_(Appendix_L_Cont.)_-_Part_7_of_10.pdf
Transport addendum Appendix L 1501-23_TA_Addendum_(Appendix_L)_-_Part_5_of_10.pdf
Transport addendum Appendix M and N 1501-23_TA_Addendum_(Appendix_M_and_N)_-_Part_8_of_10.pdf
Transport addendum Appendix O and P 1501-23_TA_Addendum_(Appendix_O_Cont._and_P)_-_Part_10_of.pdf
Transport addendum Appendix O 1501-23_TA_Addendum_(Appendix_O)_-_Part_9_of_10.pdf
Flood Risk Assessment addendum Appendix F Appendix_F.pdf
Flood Risk Assessment addendum Appendix G Appendix_G.pdf
Proposed realignment of A1198 1501-23.PL05_(A)_-_Prop._Realignment_of_A1198.pdf
Sheepfold Lane Modifications 1501-23.SK406_-_Sheepfold_Lane_Modifications.pdf
Business Park Access A1198 1501-23.SK408_-_Business_Park_Access_A1198.pdf
Transport addendum A to H 362900_1501-23_TA_Addendum_(Text,_Appendix_A_to_H)_-_Part_1_of_10_Redacted.pdf
2015_03_13_Appendix_1.pdf
2015_03_13_Timelines_for_Cambourne_West_amendment.pdf
2015_03_13_West_Cambourne_response_letter.pdf
85S-04J_Site_Boundary.pdf
85S-71K_Phasing_Plan.pdf
85S-73J_Existing_Features.pdf
85S-74J_OpenSpace.pdf
85S-75J_Landscape_and_ecology.pdf
85S-76P_Development_Areas.pdf
85S-77J_BuildingHeights.pdf
85S-78L_Access_and_Circulation.pdf
85S-79H_Tree_Protection_Plan.pdf
A1198_Junction.pdf
Affordable_Housing_Study.pdf
Appendix_10.1.pdf
Appendix_11.1_0.pdf
Appendix_12.10.pdf
Appendix_12.1A.pdf
Appendix_12.1B.pdf
Appendix_12.2.pdf
Appendix_12.3.pdf
Appendix_12.4.pdf
Appendix_12.5.pdf
Appendix_12.6.pdf
Appendix_12.7_0.pdf
Appendix_12.8.pdf
Appendix_12.9_Part_A.pdf
Appendix_12.9_Part_B.pdf
Appendix_12.9_Part_C.pdf
Appendix_12.9_Part_D.pdf
Appendix_12.9_Part_E.pdf
Appendix_13.1.pdf
Appendix_13.2_0.pdf
Appendix_13.3_A_0.pdf
Appendix_13.3_B.pdf
Appendix_13.3_C.pdf
Appendix_13.3_D.pdf
Appendix_13.3_E.pdf
Appendix_13.3_F.pdf
Appendix_13.3_G_3.pdf
Appendix_13.4.pdf
Appendix_14.1_A_0.pdf
Appendix_14.1_B_0.pdf
Appendix_15_0.pdf
Appendix_16.1_4.pdf
Appendix_2_Part1.pdf
Appendix_2_Part2.pdf
Appendix_2.1_Part_A.pdf
Appendix_2.1_Part_B.pdf
Appendix_2.1_Part_C.pdf
Appendix_2.2.pdf
Appendix_2.3.pdf
Appendix_5.1.pdf
Appendix_7.1.pdf
Appendix_7.2.pdf
Appendix_7.3.pdf
Appendix_7.4.pdf
Appendix_7.5.pdf
Appendix_7.6.pdf
Appendix_7.7.pdf
Appendix_7.8-2.pdf
Appendix_7.8_1.pdf
Appendix_8.1.pdf
Appendix_8.2.pdf
Appendix_9.1_Part_A.pdf
Appendix_9.1_Part_B.pdf
Appendix_9.1_Part_C.pdf
Appendix_9.1_Part_D.pdf
Appendix_9.1_Part_E.pdf
Appendix_9.1_Part_F.pdf
Appendix_9.2.pdf
Appendix_9.3.pdf
Appendix_9.4.pdf
Appendix_9.5_B.pdf
Appendix_9.5_C.pdf
Appendix_9.6_2.pdf
Appendix_9.6_A.pdf
Appendix_9.6_B.pdf
Appendix_9.6_C.pdf
Appendix_9.6_D.pdf
Cambourne_Road_Roundabout_Redesign.pdf
Caxton_Gibbet_Roundabout_Redesign.pdf
Chapter_1_Introduction.pdf
Chapter_10_Air_Quality.pdf
Chapter_11_Noise.pdf
Chapter_12_Hydrology.pdf
Chapter_13_Cultural_Heritage.pdf
Chapter_14_Lighting.pdf
Chapter_15_Waste.pdf
Chapter_16_Health.pdf
Chapter_17_Socio_Economic.pdf
Chapter_18_Summary.pdf
Chapter_2_EIA_Methodology.pdf
Chapter_3_Site_Description_0.pdf
Chapter_4A.pdf
Chapter_5_Part_A.pdf
Chapter_5_Part_B.pdf
Chapter_5_Part_C.pdf
Chapter_5_Part_D.pdf
Chapter_5_Part_E.pdf
Chapter_6_Construction_Programme.pdf
Chapter_8_Ecology.pdf
Chapter_9_Transport_Part_A.pdf
Chapter_9_Transport_Part_B.pdf
DAS.pdf
Employment_and_Economic_Impact_Assessment.pdf
Heads_of_Terms.pdf
Landscape_and_Visual_Chapter_7A.pdf
Landscape_and_Visual_Chapter_7C.pdf
Landscape_and_VisualChapter_7B.pdf
Non_Technical_Summary_part_1.pdf
Non_technical_Summary_part_2.pdf
Non_technical_Summary_part_3.pdf
Non_technical_Summary_part_4.pdf
Planning_Application_Forms_0.pdf
Planning_Application_Schedule.pdf
Planning_Statement_1.pdf
Retail_Assessment.pdf
Statement_of_Community_Involvement.pdf
Sustainablity_Statement.pdf
HTS Name: wphappdetail03-default.hts
Logical ID: WPHAPPDETAIL
Stonewall, Gay and Lesbian Charity - opens in a new windowBeacon Authority logoInvestor in People logo