Planning Applications



Application Details

S/2184/16/OL

26-Aug-2016

Outline Planning (Small Major)

31-Jan-2019

Harston CP Hauxton CP

Former Waste Water Treatment Facility, Cambridge Road, Hauxton, Cambridgeshire

Demolition of structures, remediation, and redevelopment for up to 32 dwellings with new areas of open space, associated infrastructure and other associated works

Out for Consultation

Neighbours, Parish Councils and statutory bodies have been invited to comment on the application and express their views to assess whether the scheme is acceptable. The planning officer will visit the site for inspection and assess the surrounding area, whilst considering relevant policies and consultation responses. If necessary the officer will collect site specific information, for example by taking photographs. The planning officer will then assess the information collected.

Associated Media

Plans, drawings and other material submitted to the local authority are protected by the Copyright, Designs and Patents Act 1988 (section 47). You may only use material which is downloaded and/or printed for consultation purposes, to compare current applications with previous schemes and to check whether developments have been completed in accordance with approved plans. Further copies must not be made without the prior permission of the copyright owner.

Description Filename
Application Form NPD ApplicationFormNoPersonalData.pdf
Summary AttachmentSummary.pdf
Heads of Terms Draft_Heads_of_Terms.pdf
Planning Statement Planning_Statement.pdf
Affordable Housing Statement Affordable_Housing_Statement.pdf
Dwg No PL1246-VW-001-06 - Illustrative Masterplan Dwg_N0_PL1246-VW-001-06.pdf
Dwg No PL1246-1-AB-002-0 - Location Plan Dwg_No_PL1246-1-AB-002-0.pdf
Dwg No PL1246-ID-003 - Phasing Plan Dwg_No_PL1246-ID-003.pdf
Dwg No PL1246-VW-004-08 - Parameter Plan Dwg_No_PL1246-VW-004-08.pdf
Dwg No W120566/AT/A03 - Proposed Site Access Design Dwg_No_W120566-AT-A03.pdf
Covering Letter Covering_Letter.pdf
Design & Access Statement Part 1 of 2 Design_and_Access_Statement_Part1.pdf
Design & Access Statement Part 2 of 2 Design_and_Access_Statement_Part2.pdf
Design Codes Design_Codes.pdf
Green Belt Statement Green_Belt_Statement.pdf
Health Impact Statement Health_Impact_Assessment.pdf
Services Appraisal Services_Appraisal_May_2016.pdf
Statement of Community Involvement Statement_of_Community_Involvement.pdf
Sustainability Statement Sustainability_Statement.pdf
Neighbours Notified 2184_Neighbours.pdf
Appendix 11: Acoustic assessment 11.1_Acoustic_Assessment.pdf
Appendix 11: Construction phase noise 11.2_Construction_Phase_noise.pdf
Appendix 11: Noise flows 11.3_Noise_flows.pdf
Appendix 11: Traffic noise 11.4_Traffic_noise.pdf
Appendix 15: Ecology 15.1_-_Surveys.pdf
Appendix 15: Ecology 15.2_-_LEMP.pdf
Appendix 16: Flood Risk Assessment 16.1_FRA.pdf
Appendix 2.1: Application drawings 2.1.pdf
9.1 Site investigation report Part 1 9.1_Part_IIa_Site_Investigation_Report_Final_Draft_Part1.pdf
9.1 Site investigation report Part 2 9.1_Part_IIa_Site_Investigation_Report_Final_Draft_Part2.pdf
9.1 Site investigation report Part 3 9.1_Part_IIa_Site_Investigation_Report_Final_Draft_Part3.pdf
9.1 Site investigation report Part 4 9.1_Part_IIa_Site_Investigation_Report_Final_Draft_Part4.pdf
9.1 Site investigation report Part 5 9.1_Part_IIa_Site_Investigation_Report_Final_Draft_Part5.pdf
9.1 Site investigation report Part 6 9.1_Part_IIa_Site_Investigation_Report_Final_Draft_Part6.pdf
9.2 Preliminary CSM Final draft part 1 9.2_Preliminary_CSM_Final_Draft_Part1.pdf
9.2 Preliminary CSM Final draft part 2 9.2_Preliminary_CSM_Final_Draft_Part2.pdf
9.2 Preliminary CSM Final draft part 3 9.2_Preliminary_CSM_Final_Draft_Part3.pdf
9.2 Preliminary CSM Final draft part 4 9.2_Preliminary_CSM_Final_Draft_Part4.pdf
9.2 Preliminary CSM Final draft part 5 9.2_Preliminary_CSM_Final_Draft_Part5.pdf
9.2 Preliminary CSM Final draft part 6 9.2_Preliminary_CSM_Final_Draft_Part6.pdf
9.2 Preliminary CSM Final draft part 7 9.2_Preliminary_CSM_Final_Draft_Part7.pdf
9.2 Preliminary CSM Final draft part 8 9.2_Preliminary_CSM_Final_Draft_Part8.pdf
9.2 Summary report 9.3_Hauxton_WWTP_CWRA_v0.pdf
9.4 Summary report Part 1 9.4_VFLI_WWTP_GI_2013_Part1.pdf
9.4 Summary report Part 2 9.4_VFLI_WWTP_GI_2013_Part2.pdf
9.4 Summary report Part 3 9.4_VFLI_WWTP_GI_2013_Part3.pdf
9.4 Summary report Part 4 9.4_VFLI_WWTP_GI_2013_Part4.pdf
9.4 Summary report Part 5 9.4_VFLI_WWTP_GI_2013_Part5.pdf
9.4 Summary report Part 6 9.4_VFLI_WWTP_GI_2013_Part6.pdf
9.4 Summary report Part 7 9.4_VFLI_WWTP_GI_2013_Part7.pdf
9.5 Water Risk assessment 9.5_Hauxton_WWTP_CWRA.pdf
9.6 Human Health risk assessment 9.6_WWTP_Hauxton_HH_GQRA_2015_Final.pdf
9.7 Remediation strategy 9.7_Remediation_Strategy_(2016).pdf
9.8 Amended discharge consent 9.8_Amended_Discharge_Consent.pdf
Appendix 12.1: Air Quality Appendix_12.1.pdf
Appendix 12.2 Air Quality Appendix_12.2.pdf
Appendix 12.3 Air Quality Appendix_12.3.pdf
Appendix 12.4 Air Quality Appendix_12.4.pdf
Appendix 12.5 Air Quality Appendix_12.5.pdf
Appendix 12.6 Air Quality Appendix_12.6.pdf
Appendix 13.1 Figures part 1: LVIA Appendix_13.1_-_Figures_Part1.pdf
Appendix 13.1 Figures part 10 LVIA Appendix_13.1_-_Figures_Part10.pdf
Appendix 13.1 Figures part 11 LVIA Appendix_13.1_-_Figures_Part11.pdf
Appendix 13.1 Figures part 2 LVIA Appendix_13.1_-_Figures_Part2.pdf
Appendix 13.1 Figures part 3 LVIA Appendix_13.1_-_Figures_Part3.pdf
Appendix 13.1 Figures part 4 LVIA Appendix_13.1_-_Figures_Part4.pdf
Appendix 13.1 Figures part 5 LVIA Appendix_13.1_-_Figures_Part5.pdf
Appendix 13.1 Figures part 6 LVIA Appendix_13.1_-_Figures_Part6.pdf
Appendix 13.1 Figures part 7 LVIA Appendix_13.1_-_Figures_Part7.pdf
Appendix 13.1 Figures part 8 LVIA Appendix_13.1_-_Figures_Part8.pdf
Appendix 13.1 Figures part 9 LVIA Appendix_13.1_-_Figures_Part9.pdf
Appendix 13.2 Lanscape Baseline and effects Appendix_13.2_-_Landscape_Baseline_and_Effects.pdf
Appendix 13.3 Visual baseline and effects Appendix_13.3_Visual_Baseline_and_Effects.pdf
Appendix 13.4 Photographs Appendix_13.4_-_Photo's_&_Photomontages.pdf
Appendix 13.5 Stage 1 and 2 arboricultiural report Appendix_13.5_-_Stage_1_and_2_Arb_Report.pdf
Appendix 14.1: Archaelogy Appendix_14.1_DBA.pdf
Appendix 14.2 Archaelogy Appendix_14.2_-_email_correspondance.pdf
Environmental Statement - Content list Content_List.pdf
Appendix 14: Archealogy ES_Figure_14.1.pdf
Development site location plan Figure_10.1.jpeg
Development site location plan Figure_10.2.jpeg
Environmental Statement - Main Text chapters 1-18 Main_Text_Chapters_1_-_18.pdf
Environmental Statement Non-technical summary Non-technical_Summary.pdf
Appendix 8: Transport assessment Transport_Assessment.pdf
SUPPLEMENTARY HIGHWAYS INFORMATION 21 DEC 16 TN11-IS-120566-Supplementary_Information-03.pdf
Bat Survey Report (Additional Information) 854939_-_Hauxton_WWTW_-_Bat_Report_2016_Rev02.pdf
Committee Report 2184-Hauxton_WWTW_report.pdf
Committee Heads of Terms 2184-_Hauxton_WWTW_Heads_of_Terms.pdf
Air_Quality_comments.pdf
Anglian_Water_comments.pdf
Archaeology_Comments.pdf
CCC_education_comments.pdf
Consultation_response.pdf
Copy_of_C.5_HHRA_Working_Remediation_Targets__v3.pdf
CPPF_comments.pdf
EA_response.pdf
Ecology_comments.pdf
Ecology_info.pdf
EHO_comments.pdf
Harston_PC_comments.pdf
Haslingfield_PC_comments.pdf
Hauxton_Technical_Note_Final_with_data.pdf
Housing_Comments.pdf
Landscape_comments.pdf
LHA_comments_1.pdf
LHA_comments_2.pdf
LHA_comments_3.pdf
LHA_comments_4.pdf
LHA_comments_5.pdf
LHA_conditions.pdf
LLFA_comments_2.pdf
LLFA_comments.pdf
Neighbour_letter_-_Old_Rectory_2.pdf
Neighbour_letter_-_Old_Rectory.pdf
Network_FEH_Rainfall_info.pdf
Network_FSR_Rainfall_info.pdf
PHE_Response.pdf
Surface_Water_Exceedance_Routes_info.pdf
Technical_note_HH_GQRA_Criteria_Final.pdf
Urban_Design_response.pdf
HTS Name: wphappdetail03-default.hts
Logical ID: WPHAPPDETAIL
Stonewall, Gay and Lesbian Charity - opens in a new windowBeacon Authority logo